The status provided to the Town of Clarkson by its engineers, MRB Group, is as follows:
· A bid opening was held for the Town of Clarkson Water Improvement Benefit Area No. 1 (WIBA #1) on July 16th. Three companies submitted bids, and the lowest bidder was Pilon Construction Co., Inc. with a total bid price of $5,603,420.00.
· The Clarkson Town Board awarded the contract to Pilon Construction Co., Inc. on July 23rd.
· Agreements are currently being prepared and circulated.
· It is anticipated that a pre-construction meeting will be held in September with construction immediately following.
· Once the pre-construction meeting is held, the Town will receive a proposed schedule from Pilon Construction Co., Inc. along with estimated completion dates for the project.
If you have any questions, please feel free to contact Scott Mattison, Engineer @ MRB Group @ 585.340.3661, or Clarkson Town Hall @ 585.637.1130.
Water Main Installation Information
– Town Responsibility
· Advertise Bid for Contractors – (est. Spring/Summer 2024) completed
· Award Bid to Contractor – (est. Spring/Summer 2024) completed
– Contractor Responsibility
· Install the water main (start Fall 2024)
· Install service taps at the residence @ resident’s choice of location.
· Install service line to right of way.
· Restore the lawn and driveway to its former condition.
– Homeowner Responsibility
· Install water service from the right-of-way to the house with the contractor of their choice.
· Service can be done prior to waterline or approval.
– Water Meter
· When construction begins, MCWA will hold a water meter sign-up event for property owners. Installation appointments will be made thereafter. Est. cost $260.00.
Please feel free to contact Scott Mattison, Engineer @MRB Group, 585.340.3661 or Clarkson Town Hall, 585.637.1130 with your questions