Skip to main content

(WIBA) Water Main Installation Information

By February 8, 2024February 13th, 2024All Posts

(Updated February 8th)
Town of Clarkson WIBA #1
Water Main Installation Information

Town Responsibility

1. Advertise Bid for Contractors – (est. Spring/Summer 2024)
2. Award Bid to Contractor – (est. Spring/Summer 2024)

Contractor Responsibility

1. Install the water main – (est. Summer/Fall 2024)
2. Install service taps at the residence at the resident’s choice of location.
3. Install service line to right of way.
4. Restore the lawn and driveway to its former condition.

Homeowner Responsibility

1. Install water service from the right of way to the house with the contractor of their choice.
2. Service can be done prior to waterline or approval.

Water Meter

1. When construction begins, MCWA will hold a water meter sign-up event for property owners, and installation appointments will be made thereafter. Est. cost $260.

Information provided by:
Robert M. Viscardi, Highway Superintendent
585-637-1132
February 8, 2024

Link to Document (Upd. 2/8)